Typically at the planning stage the site constraints are identified and a Surface Water Strategy is developed to demonstrate that the surface water can be drained from the site sustainably and without increasing the risk of flooding. Our team of experienced drainage engineers is able to develop this strategy into a detailed drainage design in readiness for construction. We can provide detailed drainage layout plans, cross sections and drainage schedules. Using the latest design and hydraulic software packages, we can accurately account for existing and proposed ground levels within our network design to ensure hydraulic connectivity.